Installing Stonecarpet

All the quartz stone is dyed and matched to the design specifications at the
factory where it will be package and shipped for installation.

Our patented resin is delivered to the job site.

Quartz stones are packaged in paper and shipped to site. The colored stones are then mixed to specs on-site.

After the stones are mixed to match color they are then loaded into the mixer.

The mixer combines the perfect amount of resin with rocks ready to be spread on the floor.

The workers then begin to spread the mixture on the floor by hand.

The workers then trowel the stone to the desired 3/8″ thickness.

Continuing to hand trowell the system gets the floor ready for the final hover trowell.

The hover trowel closes and tightens the stonecarpet system to complete the installation process.

After only 12 hours the floor is ready to walk on, 7 days later the floor reaches its optimal hardness.

Stonecarpet has been a choice of flooring for car dealerships, libraries, churches, and many other public high traffic applications.

This Stonecarpet floor was designed for a motocycle dealership.